PDCA methods

By in
54

Plan-do-check-act (PDCA) can be considered as the basis for all the improvement methods.  DMAIC is a derivation of it the PDCA aligns with the DMAI.

In a Kaizen event, you follow PDCA, when you Prepare-Analyze-Test-implement

Even root cause analysis follows a similar path.

At a basic level, all improvement methods are similar.

54321
(0 votes. Average 0 of 5)